Changes by last author:
Added:
* http://cell.dyndns.ws/f/ v3_... 1.1.99 (2012-03-25 or newer)
* VT 2012-03-27 or newer, or unzip [VTconfig1.1.99.zip] in existing VT * connect 2nd WBO2 sensor into 1st connector, do the calibration, remember result. Write result into wbo2 calibration sensor 2" (was ri_target"), then burn * connect WBO2 SENSOR 1 into plug 1 and calibrate as usually. |